Site safety template, free to use
Scaffold inspection record
Statutory inspection record for scaffolds: before first use, at least every seven days and after events that could affect stability.
Print it blank and fill it in on site, or use it as the structure for your own version. No sign-up, no email, no watermark. A competent person must adapt and approve any document before it is used on a real project.
To save as a PDF: press Cmd+P (Mac) or Ctrl+P (Windows), then choose Save as PDF. The page furniture is removed automatically.
Scaffold inspection record
Free template from thebuildingsafetyact.com. To be reviewed and approved by a competent person.
Scaffold details
| Project / site: | Scaffold location and reference: |
| Erected by: | Design reference (if designed scaffold): |
| Handover date: | Maximum permitted load: |
Inspection
| Date and time | Reason (first use / 7 day / after alteration / after event) | Defects found | Action taken | Safe to use? (Y/N) | Inspector name | Signature |
|---|---|---|---|---|---|---|
Notes
Competence declaration
| Inspector name: | Qualification: |
| Employer: | Signature: |
| Date: |
Free template from thebuildingsafetyact.com. This is a starting template, not professional advice. It must be reviewed, amended and approved by a competent person for the specific task, site and conditions before use. The Building Safety Act site and AI Metric Ltd accept no liability for its use.