Building Safety Act template, free to use
Change control log (higher-risk buildings)
The log that connects the Gateway 2 approval to what was actually built: every change, its category, justification and evidence.
Print it blank and fill it in on site, or use it as the structure for your own version. No sign-up, no email, no watermark. A competent person must adapt and approve any document before it is used on a real project.
To save as a PDF: press Cmd+P (Mac) or Ctrl+P (Windows), then choose Save as PDF. The page furniture is removed automatically.
Change control log (higher-risk buildings)
Free template from thebuildingsafetyact.com. To be reviewed and approved by a competent person.
Project details
| Project: | Building control approval reference: |
| Principal contractor: | Principal designer: |
| Log owner: | Version and date: |
Change register
| Ref | Date raised | Description of change | Category (major / notifiable / recorded) | Justification and compliance basis | BSR submitted (date) | BSR decision (date) | Drawings / documents revised | Status |
|---|---|---|---|---|---|---|---|---|
Notes on categorisation decisions
Sign-off
| Prepared by: | Signature: |
| Date: | Approved by: |
| Signature: | Date: |
Free template from thebuildingsafetyact.com. This is a starting template, not professional advice. It must be reviewed, amended and approved by a competent person for the specific task, site and conditions before use. The Building Safety Act site and AI Metric Ltd accept no liability for its use.