Gateway 3 evidence checklist
Every reason the BSR gives for completion applications stalling is an evidence failure. This checklist is organised around those four failure modes, so run it during construction while gaps are still fixable, not in the week you want to hand over.
0% (0 of 23 applicable, 0 marked N/A)
23 items outstanding. Click an item to cycle: done, not applicable, unset.
Fire and structural safety documentation
Change control records
As-built and installation evidence
Commissioning and integration
Application and handover
Progress saves in this browser only. Nothing is uploaded.
Free checklist from thebuildingsafetyact.com. A prompt, not a guarantee: the regulations and current guidance govern, and a competent person must confirm what your specific application needs. Verified 14 July 2026.
Related: why applications stall, site records as evidence and the golden thread handover template.